Re: 147: From Freeway to Boulevard - Pt 1: Design

Posted by CarolinaFan on
URL: https://forum.buildingbullcity.com/147-From-Freeway-to-Boulevard-Pt-1-Design-tp817p825.html

The traffic volume on NC 147 is significant. Average daily traffic counts by segment:

23,000, I-85-15-501
45,000, 15-501-Hillandale
62,000, Hillandale-Swift
68,000, Swift-Chapel Hill
67,500, Chapel Hill-Duke
67,500, Duke-Fayetteville
89,000, Fayetteville-Alston
79,500, Alston-Briggs
75,500, Briggs-East End Connector (I-885)

I-85 across Durham carries 100,000-110,000 per day now between 15-501 and US 70.

https://ncdot.maps.arcgis.com/apps/webappviewer/index.html?id=5f6fe58c1d90482ab9107ccc03026280

The opening of I-885 will shift some traffic away from the freeway to I-85, but a significant volume of locally-generated traffic will remain.